- Jiangxi Hongping Pumped Storage Power Station
- time:2023-05-18 10:09:25

Basic Overview
- Location: Sanzhaolun Township and Baofeng Town in Jing'an County, Yichun City, Jiangxi Province, 65 km from Nanchang City.
- Project Positioning: Jiangxi Province's first large-scale pumped storage power station and a landmark project for the Poyang Lake Ecological Economic Zone.
- Planning Scale: Total installed capacity of 2,400 MW (2.4 GW), constructed in two phases.
- Engineering Type: Weekly regulation pure pumped storage power station.
- Key Components: Upper reservoir, lower reservoir, water conveyance system, underground powerhouse, and surface switchyard.
-
Sales quantity: 45 sets of grouting recorders, equipped with flow meters, pressure gauges, density meters, heave observation devices, data logging systems, and data processing software
Phase I Project Details
- Installed Capacity: 1,200 MW (4 × 300 MW).
- Total Investment: 5.302 billion yuan (some sources cite 5.188 billion yuan).
- Construction Timeline:
- Construction began in June 2010.
- Commissioned in December 2016.
- Upper Reservoir:
- Located in Tangli Village, Hongping Natural Village, Sanzhaolun Township.
- Normal water level: 733 m; dead water level: 716 m.
- Regulating storage capacity: 20.31 million m³.
- Lower Reservoir:
- Located in Dingkengkou, Bihu Village, Baofeng Town.
- Normal water level: 181 m; dead water level: 163 m.
- Regulating storage capacity: 34.79 million m³.
- Key Parameters:
- Annual designed generation: 1.743 billion kWh.
- Annual pumping energy consumption: 2.293 billion kWh.
- Overall efficiency: 82%.
- Elevation difference between reservoirs: 528 m.
Phase II Project Details
- Installed Capacity: 1,800 MW (6 × 300 MW).
- Total Investment: 8.466 billion yuan.
- Construction Timeline:
- November 12, 2022: Feasibility report passed review in Nanchang.
- December 27, 2023: Phase II project officially commenced.
- April 10, 2025: All three working faces of the ventilation and safety tunnel completed.
- July 2, 2025: Main construction of Phase II commenced.
- Construction Features:
- Shared upper/lower reservoirs with Phase I.
- Reservoirs already built to full scale in Phase I.
- Phase II focuses on water conveyance systems, underground powerhouse, ancillary chambers, and surface switchyard.
- Utilizes 487.41 mu of land acquired during Phase I.
- Directly uses existing access roads and inter-reservoir roads from Phase I.
- Projected Benefits:
- Annual generation: ~1.98 billion kWh.
- Annual pumping energy consumption: ~2.64 billion kWh.
- Total installed capacity: 3,000 MW.
- Annual reduction of 420,000 tons of standard coal and 1.05 million tons of CO₂ emissions.
Engineering Benefits
- Grid Functions: Peak shaving, valley filling, frequency regulation, phase adjustment, and emergency backup for the power grid.
- Economic Benefits:
- Phase I: Saves 115,000 tons of standard coal annually, reducing CO₂ emissions by 253,000 tons.
- Phase II: Total installed capacity reaches 3,000 MW, saving 420,000 tons of standard coal and reducing CO₂ emissions by 1.05 million tons annually.
- Social Impact:
- Enhances grid stability and power supply reliability in Jiangxi.
- Lowers system operation costs and improves economic efficiency.
- Critical for Jiangxi's power structure adjustment and sustainable development.
- Environmental Benefits:
- Adheres to ecological protection principles with strict soil and water conservation measures.
- No resettlement issues.
- Underground tunnels traverse Sanzhaolun National Forest Park without affecting the park (approved by Jiangxi Forestry Bureau).
Project Investors
- Company Name: Jiangxi Hongping Pumped Storage Co., Ltd.
- Establishment Date: January 22, 2010.
- Registered Capital: 1.038 billion yuan.
- Shareholding Structure:
- State Grid Xinyuan Holding Co., Ltd.: 55%.
- State Grid Jiangxi Electric Power Co., Ltd.: 35%.
- Jiangxi Investment Group: 10%.
- Function: Responsible for the construction and operation of the Hongping Pumped Storage Power Station.
Project Significance
- Strategic Positioning: A key project in China's 14th Five-Year Renewable Energy Development Plan and a cornerstone for Jiangxi's energy structure transition.
- Industry Status: Jiangxi's first pumped storage power station, marking the start of such projects in the province.
- Development Impact: Signals accelerated growth in Jiangxi's pumped storage projects.
- Environmental Value: Acts as a "super battery" for grid stability and efficient water resource utilization in mountainous regions.
Engineering Features
- Geographical Advantages: Jiangxi's 2,400+ rivers (total length 18,400 km) provide natural conditions for pumped storage development.
- Technical Characteristics: Utilizes natural highland basins for the upper reservoir and natural rivers for the lower reservoir, with a 528 m elevation difference.
- Innovative Management:
- Passed State Archives Administration acceptance in 2018.
- Generated 10,248 paper archives, 10,334 photos, and 3,868 rock core archives.
Honors and Certifications
- National Quality Project Gold Award (2018–2019).
- China Electric Power Quality Project Award.
- Fifth National Civilized Unit (2017).
- National "Ankang Cup" Competition Winning Enterprise.
- Jiangxi May 1st Labor Medal.
As a key project for Jiangxi's energy structure transition, the Hongping Pumped Storage Power Station will achieve a total installed capacity of 3,000 MW upon completion of Phase II. It will annually save 420,000 tons of standard coal and reduce CO₂ emissions by 1.05 million tons, significantly advancing Jiangxi's "Dual Carbon" goals and green transformation. The station serves as a critical "battery" for regional energy security and sustainable development.




