- NW2005 Grouting and Water Pressure Monitoring System
- time:2023-05-18 10:08:20

Technical Specifications and Features of Grouting Monitoring System
I. Core Advantages
1. User-Friendly Operation
- Intuitive, clean, and aesthetically designed human-machine interface (HMI);
- Operators require only minimal training to become fully proficient.
2. Innovative Design
- Main interface features a human-centered modular layout—distinct from the industry-standard tabular format;
- Harmonious color scheme and logical layout;
- Real-time display and query capabilities for:
- Borehole information
- Instantaneous parameters
- Cumulative data
- Process data and real-time grouting curves
3. Comprehensive Functionality
Feature No. Description ① Four-Parameter Real-Time Monitoring Simultaneously monitors and records flow rate, pressure, water-cement ratio, and deformation (heave observation)—one of the few systems in China’s market that truly supports full four-parameter online monitoring. ② Flexible Multi-Cycle Modes Supports multiple circulation modes:
• 4-parameter large/small circulation
• 3-parameter large/small circulation
• 2-parameter large/small circulation
Mode switching requires no hardware or software changes—only add or remove corresponding flow/density sensors.③ Automatic Pressure Control Integrates with automatic pressure regulation devices for real-time closed-loop pressure control. ④ Remote Heave Monitoring Compatible with heave monitoring instruments for remote, real-time deformation tracking. ⑤ Dual Water-Cement Ratio Detection Methods Offers two detection technologies:
• Ionization-based (nuclear density gauge)
• Differential pressure-based (range: 1.0–2.2 g/cm³)
The only manufacturer in China offering both methods.⑥ Built-in Self-Diagnostic Function Automatically validates system parameters and alerts users immediately upon configuration errors, preventing operational mistakes. ⑦ Advanced Calculation Capabilities • Automatically converts slurry-column and water-column pressures
• Calculates cumulative volumes of added sand or clay4. High Stability
- Main Controller: Industrial-grade portable computer designed for field surveying—more robust and reliable than standard laptops;
- Data Acquisition Unit: Equipped with high-precision isolated voltage regulators and A/D isolation modules to effectively suppress on-site electromagnetic interference;
- Pressure Sensors: Utilize aerospace-grade sputtered thin-film sensing elements, ensuring high accuracy, strong anti-interference performance, and long-term stability.
5. Advanced Technology
- Database Platform: Microsoft SQL Server 2000
- Powerful data management, analysis, querying, and secondary development capabilities;
- Optimized for handling massive datasets generated during grouting operations.
II. Technical Parameters
Main Unit Specifications
Parameter Value Number of Channels 2 Sampling Rate 60 samples/second Pressure Resolution 0.01 MPa Flow Resolution 0.1 L/min Density Resolution 0.01 g/cm³ Heave Observation Resolution 1 μm Power Supply AC 220V ±20% Frequency 50 Hz Operating Temperature –5°C to +45°C Humidity <90% RH Sensor Specifications
Pressure Transmitter
- Measurement Range: 0–10 MPa
- Accuracy (FS): ±0.1%
- Overpressure Tolerance: 120%
- Connection Type: M20 × 1.5
- Output Signal: 4–20 mA
Flow Meter
- Measurement Range: 0–150 L/min
- Accuracy (FS): ±0.5%
- Power Supply: AC 220V ±20%
- Pipe Diameter: D40 mm (customizable)
- Output Signal: 4–20 mA
Density Meter
- Measurement Range: 1.0–2.2 g/cm³
- Output Signal: 4–20 mA
Displacement Sensor (Heave Monitoring)
- Measurement Range: 0–5000 μm
- Output Signal: 0–5 V
- Accuracy (FS): ±0.02%
Computer Configuration
Component Specification Operating System Windows XP CPU Intel T4300 RAM 2 GB Hard Drive 250 GB
III. Typical Reference Configurations
Configuration 1: One Unit, Two Holes – 2-Parameter Small Circulation
Equipment Quantity NW2005 Data Acquisition Unit 1 NW2005 System Software 1 Computer (Lenovo Zhaoyang E42L) 1 Printer (Canon LBP3018) 1 Flow Sensors (0–150 L/min) 2 Pressure Transmitters (0–10 MPa) 2 Supported Functions: Real-time grouting curve generation & printing, live data organization.
Configuration 2: One Unit, Two Holes – 3-Parameter Large Circulation
Equipment Quantity NW2005 Data Acquisition Unit 1 NW2005 System Software 1 Computer (Lenovo Zhaoyang E42L) 1 Printer (Canon LBP3018) 1 Water-Cement Ratio Detectors (Ionization or Differential Pressure Type) 2 Inlet Flow Sensors (0–150 L/min) 2 Return Flow Sensors (0–150 L/min) 2 Pressure Sensors (10 MPa) 2 Supported Functions: Real-time grouting curve generation & printing, live data organization.
Note: All configurations are customizable based on project requirements and can be scaled to support four-parameter monitoring or multi-hole parallel operations.
Hangzhou Changjie Technology Co., Ltd.
Pioneering Intelligent Grouting Monitoring Solutions
Ensuring engineering quality through innovation—driving construction intelligence with data.




