NW2005 Grouting and Water Pressure Monitoring System
time:2023-05-18 10:08:20

Technical Specifications and Features of Grouting Monitoring System

I. Core Advantages

1. User-Friendly Operation

  • Intuitive, clean, and aesthetically designed human-machine interface (HMI);
  • Operators require only minimal training to become fully proficient.

2. Innovative Design

  • Main interface features a human-centered modular layout—distinct from the industry-standard tabular format;
  • Harmonious color scheme and logical layout;
  • Real-time display and query capabilities for:
    • Borehole information
    • Instantaneous parameters
    • Cumulative data
    • Process data and real-time grouting curves

3. Comprehensive Functionality

Feature No. Description
① Four-Parameter Real-Time Monitoring Simultaneously monitors and records flow rate, pressure, water-cement ratio, and deformation (heave observation)—one of the few systems in China’s market that truly supports full four-parameter online monitoring.
② Flexible Multi-Cycle Modes Supports multiple circulation modes:
• 4-parameter large/small circulation
• 3-parameter large/small circulation
• 2-parameter large/small circulation
Mode switching requires no hardware or software changes—only add or remove corresponding flow/density sensors.
③ Automatic Pressure Control Integrates with automatic pressure regulation devices for real-time closed-loop pressure control.
④ Remote Heave Monitoring Compatible with heave monitoring instruments for remote, real-time deformation tracking.
⑤ Dual Water-Cement Ratio Detection Methods Offers two detection technologies:
Ionization-based (nuclear density gauge)
Differential pressure-based (range: 1.0–2.2 g/cm³)
The only manufacturer in China offering both methods.
⑥ Built-in Self-Diagnostic Function Automatically validates system parameters and alerts users immediately upon configuration errors, preventing operational mistakes.
⑦ Advanced Calculation Capabilities • Automatically converts slurry-column and water-column pressures
• Calculates cumulative volumes of added sand or clay

4. High Stability

  • Main Controller: Industrial-grade portable computer designed for field surveying—more robust and reliable than standard laptops;
  • Data Acquisition Unit: Equipped with high-precision isolated voltage regulators and A/D isolation modules to effectively suppress on-site electromagnetic interference;
  • Pressure Sensors: Utilize aerospace-grade sputtered thin-film sensing elements, ensuring high accuracy, strong anti-interference performance, and long-term stability.

5. Advanced Technology

  • Database Platform: Microsoft SQL Server 2000
    • Powerful data management, analysis, querying, and secondary development capabilities;
    • Optimized for handling massive datasets generated during grouting operations.

II. Technical Parameters

Main Unit Specifications

Parameter Value
Number of Channels 2
Sampling Rate 60 samples/second
Pressure Resolution 0.01 MPa
Flow Resolution 0.1 L/min
Density Resolution 0.01 g/cm³
Heave Observation Resolution 1 μm
Power Supply AC 220V ±20%
Frequency 50 Hz
Operating Temperature –5°C to +45°C
Humidity <90% RH

Sensor Specifications

Pressure Transmitter

  • Measurement Range: 0–10 MPa
  • Accuracy (FS): ±0.1%
  • Overpressure Tolerance: 120%
  • Connection Type: M20 × 1.5
  • Output Signal: 4–20 mA

Flow Meter

  • Measurement Range: 0–150 L/min
  • Accuracy (FS): ±0.5%
  • Power Supply: AC 220V ±20%
  • Pipe Diameter: D40 mm (customizable)
  • Output Signal: 4–20 mA

Density Meter

  • Measurement Range: 1.0–2.2 g/cm³
  • Output Signal: 4–20 mA

Displacement Sensor (Heave Monitoring)

  • Measurement Range: 0–5000 μm
  • Output Signal: 0–5 V
  • Accuracy (FS): ±0.02%

Computer Configuration

Component Specification
Operating System Windows XP
CPU Intel T4300
RAM 2 GB
Hard Drive 250 GB

III. Typical Reference Configurations

Configuration 1: One Unit, Two Holes – 2-Parameter Small Circulation

Equipment Quantity
NW2005 Data Acquisition Unit 1
NW2005 System Software 1
Computer (Lenovo Zhaoyang E42L) 1
Printer (Canon LBP3018) 1
Flow Sensors (0–150 L/min) 2
Pressure Transmitters (0–10 MPa) 2

Supported Functions: Real-time grouting curve generation & printing, live data organization.


Configuration 2: One Unit, Two Holes – 3-Parameter Large Circulation

Equipment Quantity
NW2005 Data Acquisition Unit 1
NW2005 System Software 1
Computer (Lenovo Zhaoyang E42L) 1
Printer (Canon LBP3018) 1
Water-Cement Ratio Detectors (Ionization or Differential Pressure Type) 2
Inlet Flow Sensors (0–150 L/min) 2
Return Flow Sensors (0–150 L/min) 2
Pressure Sensors (10 MPa) 2

Supported Functions: Real-time grouting curve generation & printing, live data organization.


Note: All configurations are customizable based on project requirements and can be scaled to support four-parameter monitoring or multi-hole parallel operations.


Hangzhou Changjie Technology Co., Ltd.
Pioneering Intelligent Grouting Monitoring Solutions
Ensuring engineering quality through innovation—driving construction intelligence with data.